One-story wall with no openings
Checks average shear, panel schedule selection, hold-down demand, and report formatting.
This page organizes validation examples that ShearWise Pro can use to compare known inputs against expected outputs. Use it to document software version, input file, hand calculation, expected result, and reviewer notes.
Start a Three-Report TrialChecks average shear, panel schedule selection, hold-down demand, and report formatting.
Checks full-height segment generation, FTAO/collector callouts, and opening labels in elevation.
Checks transfer provided vs transfer required status, floor-line straps, and second-story load path notes.
Checks story drift status, allowable ratio, Cd amplification, and plan-checker warning output.
Checks auto-fix recommendations, high-capacity options, and connector warnings.
Checks report code-basis output, hazard inputs, and formula trace consistency by selected code pack.
| Test | Purpose | Expected Output | Status |
|---|---|---|---|
| SW-001 Solid Wall | Panel and hold-down baseline | Demand, capacity, connector, and formula trace match expected tolerance. | Template ready |
| SW-002 One Opening | Opening segmentation and FTAO | Opening displayed on elevation; FTAO/collector force listed where applicable. | Template ready |
| SW-003 Multiple Wall Lines | Flexible / rigid / envelope distribution | Wall-line force table identifies governing envelope demand. | Template ready |
| SW-004 Two-Story Transfer | Unstacked upper wall transfer | Transfer provided when strap is calculated; transfer required when no connector passes. | Template ready |
| SW-005 Plan Checker Summary | AHJ review output | 1-page summary lists code basis, max shear, max connector, drift, transfer, and warning status. | Template ready |